Clear and diagnose a blocked sewer drain at Harbour Court
You are a second year plumbing apprentice on the Geelong maintenance crew.
What has happened
Sewage is surcharging from the overflow relief gully in the basement car park at Harbour Court, a 24-unit strata building in Mornington. Aisha Rahimi has cleared the drain enough to get residents going, but the blockage returned within an hour and she suspects tree roots or a collapsed section further down the line. Work order WO-26-1201 is open. You have the van with the drain cleaning machine and the camera unit. Residents are driving through the car park, the gully is in a low corner and there is sewage on the floor. The strata manager needs a written report with the cause and location before approving a repair.
Deliverables
- Completed work order with camera findings and recommended repair
- Drain layout sketch with fault location and depth
- Hazard and control list for the task
- Photographs and camera stills
Documents to use
Units of competency
Current on training.gov.au for the Construction, Plumbing and Services Training Package as at 10 September 2026.
CPCPDR2021Locate and clear blockagesCPCPCM2043Carry out WHS requirementsCPCPCM2039Carry out interactive workplace communicationCPCPCM2045Handle and store plumbing materialsCPCPCM2040Read plans, calculate quantities and mark out materialsQualifications
CPC20720Certificate II in DrainageCPC32420Certificate III in PlumbingWhat to look for
Evidence guide
Check that biological hazards, traffic and machine hazards are identified with practical controls, that the camera findings give a distance and depth a repair crew could use, and that the sketch shows flow direction and fixtures correctly. The work order must be complete enough for the strata manager to approve the repair. Note any disinfectant used against the chemical register.