Respond to a client complaint about the balcony remediation works
You are the Contracts Administrator working with Business Support.
What has happened
An owner at the Peninsula Strata balcony remediation project in Frankston has lodged a written complaint through the strata manager. The owner says grinding dust entered their apartment, that work started before 7:00 am on two days and that a pot plant on the balcony was damaged. The strata manager wants a formal written response within ten days and has hinted at withholding the next progress claim. The site diary shows an environmental hazard report for dust on 4 September and a corrective action that was closed. The site supervisor says the crew arrived early but did not start noisy work before 7:00 am. The General Manager will sign the response and wants it factual, fair and consistent with the contract.
Deliverables
- Complaint log entry in the register
- Summary of evidence from the site diary and interviews
- Draft response letter for the General Manager
- Progress claim note for the Estimating and Contracts Manager
Documents to use
Systems to use
WHS Incident and Hazard Register
The register of injuries, near misses, hazards, environmental incidents and corrective actions across every Keystone site.
Site Diary and Job Register
The daily record for each construction project: weather, workers on site, work done, deliveries, inspections, delays and instructions.
Units of competency
Current on training.gov.au for the Construction, Plumbing and Services Training Package as at 10 September 2026.
CPCCBC4024Resolve business disputesCPCCBC4008Supervise site communication and administration processes for building and construction projectsCPCCBC4003Select, prepare and administer a construction contractCPCCBC4009Apply legal requirements to building and construction projectsQualifications
CPC40120Certificate IV in Building and ConstructionCPC50320Diploma of Building and Construction (Management)What to look for
Evidence guide
The response must address every point in the complaint, rely on the site records rather than assertion, offer a remedy for the dust and the pot plant where the records support fault, and stay within the contract's dispute and claim provisions. Look for a professional tone, no admissions beyond the evidence and a clear explanation to the manager of the claim position.